2 BHK Resale Flat in Megapolis Hinjewadi Pune – 7th Floor, ₹80 Lakh
Megapolis Splendour, hinjewadi, Phase 3, Pune
Price ₹80,00,000/Basic Cost
Description
Unfurnished 2 BHK resale flat in Megapolis Hinjewadi Pune – 855 sq ft carpet (1,140 sq ft saleable) on the 7th floor of a 14-storey tower in Megapolis Splendour, garden-facing, with 2 bathrooms, a balcony plus a dry balcony, and one covered car parking included in the price. At ₹80 Lakh basic cost (registration and stamp duty extra), this 2 BHK resale flat in Megapolis Hinjewadi Pune is currently the most affordable 2 BHK in the township on Key2Home.in: an 11-year-old, loan-free home with clear title, right behind the TCS Sahyadri Park campus in Hinjewadi Phase 3 and a short walk from the Megapolis Circle station on Pune Metro Line 3. Compare it with our other resale flats in Hinjewadi, Wakad, Punawale and Baner, or WhatsApp Key2Home.in Properties on 7391883544 to book a site visit for this 2 BHK resale flat in Megapolis Hinjewadi Pune.
Key Highlights – 2 BHK resale flat in Megapolis Hinjewadi Pune
🌳 Garden-facing, 7th of 14 floors – quiet side, open outlook
📐 855 sq ft carpet / 1,140 saleable – one of the better ratios in Splendour
💰 ₹80 Lakh basic – ≈ ₹9,350 per sq ft carpet, ₹10 L under the next comparable unit
🚿 2 bathrooms – attached master + common
🌤 Balcony + dry balcony – separate wash-and-dry space
🚗 Covered parking included – no extra parking charge
🏛 Possession 2015, no loan, clear title – simple, bank-friendly transaction
💼 Adjacent to TCS Sahyadri Park – Phase 3 campus walkable
🚇 Megapolis Circle Metro (Line 3) – walking distance
🏫 School, polyclinic, shuttle in the township – daily life inside the gate
About Megapolis Splendour, Hinjewadi Phase 3
Megapolis is the 150-acre-plus integrated township by Pegasus Properties – the Kumar Properties–ABIL joint venture – sitting directly behind the Phase 3 IT campuses of Hinjewadi. Splendour (Smart Homes III) is its 2, 2.5 and 3 BHK cluster: 14-storey towers around a landscaped central podium with the swimming pool, clubhouse and children’s play zone. What makes the township work for families is that daily life happens inside the gates – Pawar Public School (CBSE), a polyclinic, convenience retail at Megapolis Circle and a resident shuttle to the IT park (Source: Pegasus Properties / township brochure).
This flat is on the garden side of the cluster, on the 7th floor – high enough for an open outlook, low enough to skip the lift queue. With 1,140 sq ft saleable against 855 sq ft carpet, it is one of the more efficient 2 BHK plans in Splendour, and at ₹80 Lakh basic it is the lowest-priced 2 BHK in the township currently on Key2Home.in. We also have a pool-facing 2 BHK in Splendour at ₹90 Lakh if you would rather pay for the view.
Apartment Details
Configuration: 2 BHK, 2 bathrooms
Carpet area: 855 sq ft · Saleable: 1,140 sq ft
Floor: 7th of 14
View: Garden-facing
Balconies: 1 balcony + 1 dry balcony
Flooring: Vitrified tiles
Parking: 1 covered car park, included in the price
Possession: 2015-built tower · immediate handover on registration
Society maintenance: ₹3,000 per month
Loan status: No existing loan on the flat
Documents: Clear title; bank-loan ready
Price: ₹80 Lakh basic; registration and stamp duty extra
Furnishing & Fixtures
The flat is sold unfurnished – a clean base for your own interiors, which is what most buyers at this price prefer. Fixtures visible on site (ceiling fans, kitchen platform, bathroom fittings) are confirmed at the time of the visit. No furniture or appliances are included.
Location & Connectivity
💼
IT Campuses
TCS Sahyadri Park adjacent · Infosys Phase 3, Wipro, Cognizant and Tech Mahindra within 2–4 km · Phase 1 & 2 via the internal Hinjewadi road
🚇
Metro & Transport
Megapolis Circle station on Metro Line 3 (Hinjewadi–Shivajinagar) within walking distance · PMPML bus stop at the gate · Mumbai–Pune Expressway via Marunji/Wakad
🏫
Schools & Healthcare
Pawar Public School (CBSE) inside the township · Blue Ridge Public School and Symbiosis campus nearby · Polyclinic on premises; Ruby Hall Clinic Hinjewadi and Lifepoint Hospital, Wakad
🛒
Daily Needs
Megapolis Circle market and supermarkets at walking distance · Xion Mall and Phoenix Mall of the Millennium (Wakad) 8–10 km · Restaurants along the Phase 3 stretch
Honest Watch-Outs
Metro is not yet running. Line 3’s first phase (Maan–Balewadi) has safety clearance and is expected to open in late 2026; until then the commute is by road or shuttle. Buy for the walk-to-metro upside, not for today.
Phase 3 evening traffic on the Wipro/Infosys stretch is real. Residents who work in Phase 3 rarely feel it; commuters to Baner or Kothrud should plan around peak hours.
It is an 11-year-old flat and priced like one. Budget ₹3–5 L for paint, kitchen cabinets and a bathroom refresh; the ₹10 L saving against the pool-facing unit covers it comfortably.
Ideal For
👨👩👧 First-home IT buyers A ₹80–86 L all-in budget gets you inside a full township, next to TCS, with school and shuttle at the gate.
🏠 Renters turning owners Paying ₹24–27K rent in Hinjewadi? The EMI on this flat lands in the same band.
📈 Rental investors & NRIs Township 2 BHKs let quickly to IT tenants; ~3.7% gross yield with the metro opening still ahead.
Price Insight – Hinjewadi Phase 3 Resale, September 2026
This listing
₹80 Lakh
≈ ₹9,350 per sq ft carpet · parking included · registration extra
Cheapest 7th-floor 2 BHK in the cluster; the gap to the ₹90 L pool-facing unit is view and condition, not location.
All-in estimate: ₹80 L basic plus roughly 6–7% stamp duty and registration in the Pune region puts the buyer’s total near ₹85.5–86 L (women buyers get a 1% stamp-duty concession; confirm the current slab at IGR Maharashtra). Comparable 2 BHKs in Splendour rent at ₹24,000–27,000 per month (Source: Commonfloor, 99acres) – a gross yield of about 3.7% on the basic price, above the Pune apartment average. New 2 BHK launches in Phase 3 are now ₹1.0–1.2 Cr (Source: Anarock / Knight Frank Pune reports), which is why ready township resales under ₹85 L keep moving.
The value 2 BHK in Megapolis – ₹10 Lakh under the next comparable unit
Get the floor plan, society NOC status and a same-week site visit on WhatsApp. Serious buyers also receive our Hinjewadi Phase 3 resale comparison sheet – free.
Brokerage 1% · MahaRERA Channel Partner A011262603915 · Loan assistance with leading banks
What is the price of this 2 BHK resale flat in Megapolis Hinjewadi?
The basic cost is ₹80 Lakh, which includes the covered car parking. Registration and stamp duty are extra. There is no existing loan on the flat, so the transaction is straightforward.
What is the total cost including registration and stamp duty?
Stamp duty and registration in the Pune region typically add roughly 6–7% of the agreement value, so the buyer’s all-in figure is around ₹85.5–86 Lakh. Women buyers get a 1% stamp-duty concession. Confirm the current slab on the IGR Maharashtra portal; Key2Home.in prepares the exact cost sheet before booking.
How is this flat different from the ₹90 Lakh 2 BHK in Megapolis Splendour on Key2Home.in?
This unit is garden-facing on the 7th of 14 floors in a 2015 tower, priced at ₹80 Lakh basic. The other is pool-facing on the 7th of 15 floors in a newer tower at ₹90 Lakh. Both are 855 sq ft carpet; the difference is view, building age and condition. We can show both in one visit.
Is the flat loan-free and ready for immediate possession?
Yes. There is no existing loan, the title is clear and the tower received possession in 2015, so handover is immediate on registration and leading banks process home loans on it without objections. Key2Home.in assists with loan coordination.
How far are TCS and the metro station from Megapolis Splendour?
The township is adjacent to the TCS Sahyadri Park campus in Hinjewadi Phase 3. The Megapolis Circle station on Metro Line 3 (Hinjewadi–Shivajinagar) is within walking distance; the line’s first phase has safety clearance and is expected to open in late 2026.
Explore More from Key2Home.in
More resale flats in West Pune, a golf-township upgrade at the same budget, and our 2026 guide to plot and villa investment.